NewThe Parts and Inventory Check Agent is live. Watch the run on a real Salesforce org
Defence & Aerospace

Case study · Client engagement

A Stage-Gated, Auditable Bid Process Designed for a Defence and Space Contractor

An Australian defence and space contractor needed its Salesforce org to match a demanding bid process: formal gates, approvals across divisions, risk registers, payment milestones and controlled documents. We reviewed the org and designed the solution, including one-click gate packs and approvals connected to Microsoft 365.

A spacecraft with its robotic arm extended in orbit above the EarthDefence & Aerospace
ArchitectureA bid moving through its gates

A bid starts as an opportunity within the defence systems or space division, visible only to the people entitled to see it. It moves through formal stage gates. At each gate, a risk register and payment milestones are reviewed, and a gate pack is generated in one click as a PowerPoint presentation from the Salesforce data. An approval matrix, run through Power Automate, routes the decision to the right approvers, and the outcome is written back to the opportunity in Salesforce. Bid documents live in SharePoint, linked from the bid, so the record shows every decision and where every document is.

  1. Open the bid

    • Opportunity
    • Division
    • Access by division

    Only the right people see each bid.

  2. Assess

    • Risk register
    • Payment milestones
    • Bid details

    The gate decision rests on structured data.

  3. Gate pack

    • One-click PowerPoint
    • Generated from the record

    No more assembling slides by hand.

  4. Approve

    • Approval matrix
    • Power Automate
    • Status write-back

    The decision returns to Salesforce.

  5. Document

    • SharePoint bid links
    • Document handling
    • Reports

    Every document findable from the bid.

Delivered engagement. The client is not named publicly; the industry, products and outcomes are theirs.

The starting position

Bidding for defence and space programs is unlike most selling. Opportunities are large, long and heavily governed. A bid passes through formal gates where senior people decide whether to keep investing in it, and each gate requires a clear view of the risks, the commercial terms, the payment milestones and the documents behind them. Decisions have to be recorded and defensible. Information about one program often cannot be visible to people working on another.

The contractor in this engagement works across defence systems and space, two divisions with their own programs, people and sensitivities. It already had Salesforce, but the org had not been shaped around this way of bidding. Gate preparation, approvals, risk and milestone information, and the link between a bid and its documents in SharePoint were not brought together on the bid record. A process like that can work through effort and experience, and it is hard to audit, slow to prepare for each gate and dependent on the people who know how it really runs.

The contractor engaged us, through its implementation partner, to review the existing Salesforce system and design how it should support the bid process properly.

What we designed

01 An org review

We started by reviewing the existing Salesforce org: how opportunities, accounts and users were set up, what customizations existed and where the current configuration fell short of the bid process. The review set out what to keep, what to change and what to add.

02 A bid framework with formal stage gates

The design models each bid as an opportunity that moves through formal stage gates, configured in Salesforce to match the contractor's governance. Each gate defines what must be true before a bid can progress.

03 Risk register and payment milestones

Each bid carries a structured risk register and its payment milestones, so the information decision-makers need at a gate is held as data on the bid instead of in separate spreadsheets.

04 An approval matrix with status write-back

The approval matrix decides who must approve a bid at each gate, depending on the bid's characteristics. The design runs the matrix through Power Automate, because the contractor's approvers work in Microsoft 365, and writes the approval status back to the opportunity in Salesforce. The bid record always shows where a decision stands.

05 One-click gate packs

The presentation reviewed at each gate is generated in one click as a PowerPoint from the Salesforce data. The design removes the hours spent assembling slides and, more importantly, makes sure the pack matches the record it describes.

Bid documents remain in SharePoint, where the contractor manages them, with links from the bid in Salesforce. The design covers how documents are created, linked and found, so anyone reviewing a bid can reach its documents directly.

07 Division-level access, reports and feedback

Access is designed at division level, so defence systems and space bids are visible only to the people entitled to see them. The design also covers reports for leadership, the record of interactions with customers and partners, and a way to capture feedback after gates and outcomes.

How a bid would move through the design

A business development lead in the space division opens a new opportunity for a program. Only people with access to space division bids can see it. Over the following weeks, the team builds out the risk register and the payment milestones as they learn more.

When the bid reaches its first formal gate, the lead generates the gate pack in one click. The PowerPoint pulls the bid summary, risks and milestones straight from the record. The approval request goes to the right approvers through the matrix in Microsoft 365. They review the pack and approve, and the status is written back to the opportunity, which moves to the next stage.

At any point, a director can open the bid and see its current gate, every approval decision, its risks and milestones, and links to every document in SharePoint. If an auditor later asks how the decision to proceed was made, the answer is on the record.

Why design comes first on a bid process like this

It is tempting to start configuring stages and fields straight away. On a governed defence bid process, that tends to produce a system that mirrors today's habits rather than the governance the business needs. The cost of getting gates, approvals and access wrong is high: a gate that can be skipped, an approval that is not recorded or a program visible to the wrong division undermines the whole purpose.

A detailed design settles those questions before anything is built. It defines the gates and what each requires, who approves what, how documents are handled, and who can see which bids. It also identifies the integration points with Microsoft 365, which are central to how this contractor works, and makes sure the approval and document flows complete the loop back to Salesforce.

Integrating Salesforce with Microsoft 365

The contractor works in Microsoft 365. Its approvers work in Microsoft 365, and its bid documents live in SharePoint. A design that asked everyone to move into Salesforce for approvals and documents would have met resistance and duplicated what already works.

The design instead treats Microsoft 365 as part of the solution. The approval matrix runs in Power Automate, close to the approvers. Documents stay in SharePoint, close to the people who write them. Salesforce remains the system that knows the state of every bid: which gate it is at, what has been approved, what the risks and milestones are, and where its documents are. The integration points are designed so information flows in the right direction: approval outcomes come back to Salesforce, document links are stored on the bid, and gate packs are generated from Salesforce data.

How we approached it

Review before redesign. The org review established what already worked and what had to change.

Gates as the backbone. The framework was designed around the contractor's formal gates, with data, approvals and documents attached to them.

Meet approvers where they work. Approvals were designed for Microsoft 365, with status written back to Salesforce.

Documents stay in SharePoint. The design links to documents rather than duplicating them.

Access by division from the start. Visibility rules were part of the design, not an afterthought.

Two phases, clearly scoped. The engagement was scoped as two phases totaling about 293 hours. This study describes the design; implementation of the full scope is a separate step.

The decisions that mattered

Generated gate packs. Producing the gate presentation from the record removes manual effort and keeps the pack consistent with the data.

Approval status written back. Running approvals in Microsoft 365 only works if Salesforce knows the outcome; the write-back makes the bid record complete.

Division-level visibility. Separating defence systems and space bids reflects how the contractor must protect program information.

What the design changes

AreaCurrent processDesigned process
Bid stagesInformal progressionFormal stage gates configured in Salesforce
Gate preparationSlides assembled by handOne-click PowerPoint gate packs from the record
Risk and milestonesSeparate filesRisk register and payment milestones on the bid
ApprovalsEmail and meetingsApproval matrix with status written back to Salesforce
DocumentsIn SharePoint, loosely linkedSharePoint links and handling from the bid
VisibilityNot separated by divisionDivision-level access, reports and feedback

What we would tell a defence or aerospace contractor starting this

Design your gates before you configure your org. Decide what each gate requires, who approves it and what evidence must exist, then make the system produce the gate pack and record the decision automatically. Connect approvals and documents to the tools your people already use, write every outcome back to the bid, and set visibility by division from day one. The aim is a bid process that runs faster and can explain itself to anyone who asks.

Common questions

Answered, directly.

What buyers ask about delivering this in defence & aerospace.

The engagement covers an org review and a detailed solution design across two phases, with about 293 hours scoped. We describe the design here. Implementation of the full scope is a separate step and is not presented as deployed.

The contractor’s approvers and documents live in Microsoft 365. Running the approval matrix there meets approvers where they already work, and writing the status back to the Salesforce opportunity keeps the bid record complete and auditable.

The presentation reviewed at each formal bid gate, summarizing the bid, its risks, its commercial terms and its milestones. The design generates it as a PowerPoint in one click from the Salesforce data, so the pack always matches the record.

Free architect conversation

Talk to an architect, not a sales rep.

60 seconds to brief us, and a certified architect replies within one business day.

What are you looking to architect?

Pick the closest fit. You can add detail in a moment.

Which clouds or systems are in scope?

Optional. Choose any that apply, or skip ahead.

Where does your org stand today?

Optional. A few sentences is plenty: what is working, what is stuck, and what you want to be true. Or skip ahead and tell us on the call.

Who should the architect reach?

A certified architect will reply to these details.

Takes about 30–60 seconds · No obligation · Architect replies within one business day

Protected by reCAPTCHA. Google's Privacy Policy and Terms apply.

The thinking behind this

Related reading

Where this sits

Salesforce for Large Enterprises

This work is delivered through our salesforce for large enterprises practice.

Talk to us about multi-cloud delivery

More delivery

Related case studies

  • SynconAI Consulting are Simply the Best in the Business When it comes to Salesforce implementation and AI-powered solutions, SynconAI are in a league of their own. Their expertise, dedication, and ability to deliver results that truly move the needle sets them apart from every other consulting partner we've worked with. What they achieved with our Sales Cloud, Service Cloud, and custom Agentforce agent has completely transformed how we operate streamlining our pipelines and our customer service, and automating tasks that used to consume hours of our team's time. They don't just implement technology they transform businesses. If you want the best, you work with their team.

    Jack BennettConsumer Goods & RetailUnited States

  • I had a very urgent deadline for our project reporting to be delivered and needed to build the module, dashboard and output reports in Salesforce. SynconAI were very responsive - they met with me online, responded to my emails quickly and took calls - whatever was needed to progress the work quickly. We are thrilled with the outcome and will continue to work with SynconAI in the future to continue to build our Salesforce capability and platform.

    Salesforce Managed ServicesAustralia

  • The team at SynconAI were fantastic, and promptly delivered on each project. They were able to guide us through every stage and made sure we were satisfied with the outcomes on multiple scopes of work.

    ManufacturingAustralia

  • They have been great and helping us transform out business by bringing what I conceptualize to life. Great at translating process/workflow needs into a solution. Been a pleasure work with and they're a critical part of our team and will be instrumental into bringing about my vision.

    Financial ServicesUnited States

  • Working with SynconAI was a seamless and highly professional experience from start to finish. They took the time to deeply understand our business processes before designing and implementing a Salesforce solution tailored specifically to our operational needs. The team demonstrated strong technical expertise across Salesforce configuration, automation, integrations, reporting, and user experience design.

    Salesforce Implementation

Request a demo

Request a demo

An architect shows you a live agent on a real Salesforce org and walks through how this one would work in yours. We reply within one business day.

No obligation. An architect replies, not a sales sequence.

Protected by reCAPTCHA. Google's Privacy Policy and Terms apply.